|
Traits |
|
|
|
1. One is epoxy resin
adhesive, another is epoxy acrylic acid resin adhesive (fast solidified
type).
2. high strength, strong cementing power
3. bearing the aging, low temperature resisting, acid and alkali
resisting, water-proofed resistant
4. time to solidify: 2~6h/20~25℃ (epoxy type); 20~60min (5~25℃)
5. time to working: 15~30min(5~25℃)
6. temperature of working: -10~50℃
7. easy technique of operation, fast and convenient construction
|
|
|
Application |
|
|
|
1.
reinforcement and fixation rebars of concrete components, installed
fastenings of the anchors (steeled spiral bars in grade 6.8, details
of anti-stretch force sees in information of Dazhu adhesive inner-expansion
bolts)
2. installed fastenings of vitreous walls, barriers, pipes, machinery,
steel structure with concrete, natural stone stuffs
3. installed fastenings of various materials (metals and nonmetal)
|
|
| Primary
Basic Capability |
|
|
|
|
|
|
施工工序 |
|
|

|
|
|
Working Main Point |
|
|
1.
Drill a hole: the depth is usually 10~20d approximately, the diameter
is larger 4~8mm than the rebars.
2. Clear the hole: clear up the powders in concrete.
3. Deal with the rebars: clean up the sundries on the surface.
4. Pushing in with the adhesive: using pushing-adhesive gun push
the adhesive into the bottom of the hole, the amount of the used
adhesive is about 2/3 to the hole.
5. Bonded rebars: insert the rebars or the bolts into the hole with
spin.
6. Protect: make the next procedure after solidification.
|
|
|
Packaging, Transportation, Storage and Safety |
|
|
1.
Packaging with plastic hard double tubes (2 mixed ratio: 4:1 or
2:1)
2. Every group weights 600g.
3. Stock in shady and cool, dry place.
4. Period of validity is 6 months.
5. Pay attention: please do not use the first 10cm adhesive after
opening the tube.
|
|